Project by Lambion Energy Solutions GmbH

nobilia-Werke J. Stickling GmbH & Co. KG.
nobilia-Werke J. Stickling GmbH & Co. KG.

Hot water boiler installation, 2 x 4,400 kW.
Hot water boiler installation, 2 x 4,400 kW.

The biggest German kitchen manufacturer, nobilia-Werke J. Stickling GmbH & Co. KG, has for decades been largely doing without fossil fuels to heat the entire company. Expanding production capacities and modernising a LAMBION biomass thermal power plant after thirty years of operation required a new energy concept for nobilia-Werke.

Taking economic and ecological aspects into consideration, we worked together with nobilia to look at the feasibility of a heating solution as well as a CHP system. Two structurally identical heating plants were completed to provide the large nobilia production halls with heating. The fuel used consists exclusively of the existing waste from kitchen production.

Facts

Date of installation 2009
Town, country Verl, Germany
Installed power in KW 2 x 4.400

Company

Lambion Energy Solutions GmbH
Company profile
Ralf Baues
Auf der Walme 1
34454 Bad Arolsen
Germany
Phone: +49 (0) 5691 - 807-0
Fax: +49 (0) 5691 - 807-138
Email: office@lambion.de
Web: www.lambion.de