Storing surplus electricity in the natural gas network

Surplus electricity can be used in power-to-gas facilities in order to produce hydrogen by means of electrolysis. The part of the gas that is not fed directly into the natural gas network or cannot be used can be channelled downstream for methanation as a storage option. Scientists at the DBI - Gastechnologisches Institut gGmbH in Freiberg, Saxony, are developing a biological methanation process in cooperation with other partners in the BioRePow research project. This will make it possible to produce bio-methane based on a fermentation strategy. To this end, the Freiberg researchers have developed a special tube reactor that dispenses with energy-intensive components like agitators, circulation or gas separation.

In addition to DBI, the Fraunhofer Institute for Environmental, Safety, and Energy Technology UMSICHT and the Engler-Bunte-Institut (EBI) from Karlsruhe are working on the new tube reactor to produce bio-methane. The German Federal Ministry for Economic Affairs and Energy has been promoting the project within the programme of the Industrial Collective Research (Industrielle Gemeinschaftsforschung - AiF).

Companies

###NAME###

###MAINIMG### <###DESCRITPION###

Profile: project engineer, project developer, investor

Technology: wind energy

Stay up to date

To get our newsletter every two months, just sign in.

Opinion panel

“Experiences from due diligence processes with a total volume of more than 20 GW of wind power onshore and offshore testify to our unique expertise in reviewing and negotiating technical project contracts. Our customers profit from the fact that we can bring the practical experience and current findings from our wind potential evaluation and engineering departments to bear on the project assessments.” 

Joachim Binotsch, Managing Director, Head of the “Technical Due Diligence” Department, BBB Umwelttechnik GmbH